Total Production
1,733,551 kg

MTD

Dispatches
1,525,000 kg

MTD

Average OEE
63.8%

+2.1% from last month

Downtime
164 hrs

MTD

Operating Time
1711 hrs

MTD

Production Lines
4 active

2 in maintenance

Active Anomalies (3)

Reactor R-007

Issue: Temperature Spike

Detected: 35 mins ago

Severity: Medium

Compressor C-110

Issue: High Vibration

Detected: 2 hrs ago

Severity: High

Heat Exchanger E-201

Issue: Pressure Drop

Detected: 4 hrs ago

Severity: Low

Production by Product Line

Product LineProductCapacity (kg)Planned (kg)Actual (kg)OEE
2,4 DNCB 99.5%2,4 DNCB1,200,000800,000483,76760.5%
2,4 DNCB 96%2,4 DNCB357,500357,50019,7845.5%
Apex StreamAcd C 68% Dilute Acid980,000700,000650,00076.4%
ALC StreamAcd C 62% Dilute Acid870,000600,000580,00078.3%
Daily Production
Recent inventory changes
DateProductOpening (kg)Production (kg)Closing (kg)
May 22,4 DNCB 99.5%27,50015,80025,300
May 12,4 DNCB 99.5%25,00016,50027,500
Apr 302,4 DNCB 99.5%22,00017,00025,000
Apr 292,4 DNCB 99.5%24,00012,00022,000
Apr 282,4 DNCB 99.5%26,00014,00024,000
Recent Dispatches
Latest product dispatches
IDDateProductQuantity (kg)Status
DIS-20250502-001May 22,4 DNCB 99.5%10,000Delivered
DIS-20250502-002May 22,4 DNCB 96%8,000In Transit
DIS-20250501-001May 1Acd C 68%12,000Delivered
DIS-20250501-002May 1Acd C 62%9,500Delivered
DIS-20250430-001Apr 302,4 DNCB 99.5%14,000Delivered