Distillation Column C-101

Process
Operational
Equipment Information
Basic details and specifications

Model

Koch-Glitsch MaxFrac

Location

Unit 3 - Refinery Section

Installation Date

2018-05-15

Last Maintenance

2023-06-10

Efficiency92%
Technical Specifications
Detailed technical information
capacity10,000 BPD
diameter3.5 m
height45 m
trays42
tray TypeValve
material Of Construction316L SS
design Pressure3.5 bar
design Temperature250°C
Maintenance Records
History of maintenance activities

Routine Maintenance

Routine

Inspected column internals, replaced damaged valves on trays 15-17, verified instrumentation

2023-06-10
Technician: Alex Johnson

Routine Maintenance

Routine

Cleaned level bridles, calibrated pressure transmitters, inspected manways

2023-01-15
Technician: Maria Rodriguez

Repair Maintenance

Repair

Replaced damaged downcomer on tray 28, repaired insulation on upper section

2022-08-05
Technician: David Chen